Pampa Energía III Wind Farm
14
53 MW
Pampa Energía IV Wind Farm
18
81 MW
Arauco II Wind Farm
39
100 MW
Pampa Energía VI Wind Farm
En obra
Pampa Energía II Wind Farm
14
53 MW
Pampa Energía IV Wind Farm
81 MW
18 wind turbines
Located in Coronel Rosales, Pampa Energía IV Wind Farm required a US$128 million investment. As with II and III wind farms, it sells its energy in the Term Market from Renewable Energy Sources (MATER).
- ISO 14001 - ISO 50001 - ISO 55001
Pampa Energía II Wind Farm
53 MW
14 wind turbines
Pampa Energía II Wind Farm is located in the town of Bahía Blanca. Inaugurated in March 2019, it required a US$70 million investment.
Its production is destined for the large users’ segment under the Term Market from Renewable Energy Sources (MATER).
- ISO 14001 - ISO 50001 - ISO 55001
Pampa Energía III Wind Farm
53 MW
14 wind turbines
With a US$70 million investment, in July 2019 we inaugurated Pampa Energía III Wind Farm in the town of Coronel Rosales. Just like Pampa Energía II Wind Farm, it serves the large users’ segment through the Term Market from Renewable Energy Sources (MATER).
- ISO 14001 - ISO 50001 - ISO 55001
Arauco II Wind Farm
100 MW
38 wind turbines
In December 2022, we acquired 100% of Vientos de Arauco Renovables S.A.U., a company that operates Arauco II Wind Farm in the Province of La Rioja, for a price of US$171 million.
- ISO 9001 - ISO 14001 - ISO 45001
Pampa Energía VI Wind Farm
140 MW
31 wind turbines
This new wind farm, located in the town of Bahía Blanca, will have 31 4.5-MW wind turbines and a 140 MW installed capacity. The execution of the first stage, consisting of 21 wind turbines to reach a 94.5 MW generation capacity, is currently in progress.
It is expected to start operations in the fourth quarter of 2024.