Parque Pilar Thermal Power Plant

100 MW

Pilar, province of Buenos Aires

Inaugurated in August 2017 and located in the Pilar Industrial Complex, it involved a US$100 million investment. It has a 3-km gas pipeline and a 132 KV underground line, also with a 3-km length.
It consists of six high-efficiency Wärtsilä engines that can reach full output in 20 minutes and be indistinctly fed with natural gas or fuel oil.

- ISO 9001 
- ISO 14001 
- ISO 45001
- ISO 55001